02.08.2021 project Introduction of energy efficiency measures in a multi-family residential building located at Dimitrovgarad, “Hristo Smirnenski” street №12 CIW carried out: Replacement of window frames; Implementation of thermal insulation system on the facade; Implementation of finishes in common areas; Heat and waterproofing of flat roof;